LAYING OF A NEW GAS TRANSPORT PIPELINE FROM OBEROHE TO POITZEN
New laying of gas transport pipeline no. 309 (DN 150 DP 100) from Oberohe to Poitzen over a length of approx. 6 km.
Civil engineering and pipeline construction work, relining incl. Pressure test
Crossings of other road junctions using the HDD method, lengths from 160 m to 340 m and pile driving for short lengths up to 20 m
Construction of site roads
Integration into the gas-conducting system
Crossings of biotopes using the HDD method. Lengths 570 m and 685 m
Closed dewatering