NEW CONSTRUCTION OF A GAS COMPRESSOR STATION

References

NEW CONSTRUCTION OF A GAS COMPRESSOR STATION

Client

terranets bw GmbH

Contact person

Dipl.-Ing. Vocks

Start of construction

09/2021

Construction time

3 years

Scope of services

This contract includes the extended shell construction and the turnkey construction of the station (excluding the technical building services).

Four compressor halls with a total area of approx. 1,050 m², an operations building with a floor area of approx. 1,035 m² over two floors and an energy center with an area of approx. 475 m² in reinforced concrete construction, partly with prefabricated parts, were built. The reinforced concrete structure was supplemented with masonry in the factory building.

Work carried out:

Earthworks and terrain profiling

Extinguishing water system incl. Extinguishing water basin in prefabricated construction

Four compressor halls with machine foundations and quiver foundations incl. Precast reinforced concrete elements; delivery, installation and commissioning of crane systems

Facades made of Rockpanel and external thermal insulation composite system

Carpentry work for the roofs of the energy center and compressor halls incl. Covering with roof tiles

All painting work

Foundations for techn. Equipment, such as: Piping, fittings, exhaust stacks, blowers, gas coolers, flares, oil coolers, steelwork, lamps, transmitter cabinets, etc.

Cable routes as empty conduit routes in part. shielded incl. Cable ducts

Operating building for the technical facilities incl. Control room and social rooms in solid construction

Energy center in in-situ concrete and thermal insulation composite system incl. Crane system

Steel construction for the working platforms, stairs and necessary railings