References

NEW CONSTRUCTION OF THE NATURAL GAS TRANSMISSION PIPELINE 56/22 HAMM – BERGKAMEN

References

NEW CONSTRUCTION OF THE NATURAL GAS TRANSMISSION PIPELINE 56/22 HAMM – BERGKAMEN

Client

Open Grid Europe GmbH

Contact person

Dipl.-Ing. Udo Mers

Start of construction

02/2020

Construction time

10 months

Scope of services

Gas pipeline no. 56/22 of Open Grid Europe GmbH is being renewed over a length of approx. 6 km between Hamm and Bergkamen.

WORK CARRIED OUT:

Civil engineering and pipeline construction work, relining incl. Pressure test

Construction of open culverts and road crossings using the drill-press method

New construction of approx. 6 km gas pipeline DN 300 / DP 100

Integration into the gas-conducting system by means of tapping holes

Dewatering and restoration of drainage systems

Laying of cable conduits

The work is being carried out in a joint venture with Mackscheidt Rohrleitungs- und Tiefbau GmbH & Co KG.

The technical management is the responsibility of Anton Meyer GmbH & Co.