100th rerouting of line no. 2 in Düsseldorf Rath

Client

Open Grid Europe GmbH

Contact person

Mr. Dipl.-Ing. Udo Mers

Start of construction

04/2016

Construction time

6 months

Scope of services

The 100th relocation of pipeline no. 2 (DN 700) of Open Grid Europe GmbH in the area of the Aaper Schneise (nature reserve / forest area) over a length of 2,560 m

Technical specification:

Cable diameter: 711 mm x 10 mm

Material: L 360 NB

Total relocation length: 2,560 m

MOP: 16 bar

WORK CARRIED OUT:

Road construction

Creation of excavation pits

Welding work

Pipe trench excavation and backfilling

Shoring work for tree protection etc.

Involvement of the overall management