References

CONNECTION OF TWO CAVERNS TO THE VDS EPE USING TWO PIPES (DN 300 & DN 100 / DP210)

References

CONNECTION OF TWO CAVERNS TO THE VDS EPE USING TWO PIPES (DN 300 & DN 100 / DP210)

Client

RWE POWER AG

Contact Person

Udo Mers, B.S. in Engineering

Start of construction

10/2024

Construction time

5 months

Scope of services

Complete piping, civil engineering, and dewatering work for the installation of the pipelines—including detailed engineering.

Work carried out:

Civil engineering work for approximately 1,400 m of double trench

Carrying out extensive shoring work

Installation of various cable conduits and 10-kV cables

Excavation of foundation pits for enclosed structures with depths of up to 3.5 m

Extensive and labor-intensive dewatering work

Pipeline construction for DN 300 with wall thicknesses of 25–28 mm

Pipeline construction for DN 100 with a wall thickness of 12.5 mm

Drilling of two press holes for all listed lines

Conducting pressure tests on piping systems—test pressure exceeding 500 bar

Construction of a 480-meter-long HDD borehole for DN 300 and DN 100 pipes, as well as DA 225 KSR cable protection pipes

Performance of the necessary coating work