Anton Meyer Logo
Anton Meyer Schriftzug
  • Services
    • Civil engineering and pipeline construction
    • Pipeline/plant construction
    • Building construction and civil engineering
  • News
  • Career
  • Contact
  • German

Securing the DN 700, DN 1100 and DN 1200 pipes in Kleingründlach

Construction of the ZEELINK high-pressure gas pipeline lots 3-5, incl. Construction of 11 barrier and pigging stations

NEW CONSTRUCTION OF GAS CONNECTION PIPELINE WILHELMSHAVEN-LEER (LOT 2)

PARTIAL NEW CONSTRUCTION OF GAS PIPELINE FGL 90 NEUBRANDENBURG-SPONHOLZ TO KLEIN TREBBOW

Construction of the Neckarenztal pipeline (NET) – high-pressure gas pipeline DN 500 made of steel, incl. 17 pipe jackings DN 500

Construction of the European Gas Pipeline Link (EUGAL) in lots 7 and 8

Loop management Epe-Legden

Natural gas pipeline 22. relocation of pipeline 10/10, Graben-Neudorf, SEW

Northern Black Forest pipeline (2nd construction phase)

HDL 108 Burgkirchen – Altheim Austria

1 2 Next

BUSINESS AREAS

  • Civil engineering and pipeline construction
  • Pipeline/plant construction
  • Building construction and civil engineering

INFORMATION

  • News
  • Downloads
  • Certificates

Letting

  • Suction excavator
  • Padder

CAREER

  • Career
  • Unsolicited applications
  • Pupils and students

CAREER

  • Career
  • Unsolicited applications
  • Pupils and students

ADMINISTRATION
Dackhorstweg 9
D-49828 Neuenhaus

FARM and WORKSHOP
Dackhorstweg 24
D-49828 Neuenhaus

CONTACT
Tel: +49 5941 603 0
Fax: +49 5941 603 160
Mail: info@anton-meyer.de

Xing
Facebook
Instagram
LinkedIn

© 2025 Anton Meyer GmbH & Co KG | Imprint | Data protection | Give notice | Webdesign by Marketinghuus