Scope of services
As part of the L-H gas changeover in the Osnabrück area, a new BZR station is being built in Bissendorf in the Haller Kirchweg / Haller Stiegteweg area and a connection line is being laid to the existing branch of OGE line no. 58.
The contract includes the complete construction of the new outgoing pipeline L00809 (DN200, DP16) from the BZR station on Haller Stiegteweg, starting via Kuhdamm, Dickenweg, via Schnatgraben road to a residential area, continuing via Vinckenaue, then crossing Westerhausener Straße and ending in the Wulberg / Ochsenweg area. The pipeline is approx. 4,200 m long. Various bodies of water / roads are crossed in the pipeline route using the HDD method. The remaining pipe lengths will be installed using the open laying technique. In the Ochsenweg area, a new gate valve crossing will be installed, connecting the following pipelines, L00809, L09016 and L09049.