Scope of services
Construction of a new natural gas compressor station in Rimpar as part of the NEP

Work carried out:
Three compressor halls with machine and quiver foundations incl. precast reinforced concrete elements. Basement in monolithic construction for the connecting pipes. Delivery, installation and commissioning of the crane systems. Steel construction for the ventilation center as a ridge turret.
Fuel gas building in in-situ concrete incl. Crane system.
Delivery and assembly of two switch houses with raised floors as prefabricated parts.
Foundations for technical equipment such as: Exhaust stacks, blowers, gas coolers, flares, oil coolers, steel structures, lamps, transmitter cabinets, etc.
Cable routes as empty conduit routes, partially shielded, including cable ducts.
Coating work according to AwSV.
Construction of various angled retaining walls, retaining wall 1 on pile foundations.
All painting work.
Extinguishing water system.
Terrain profiling after completion.
Fence system incl. Doors and gates.
Supply building for the technical facilities incl. Control room and social rooms in solid construction with a thermal insulation composite system, turnkey.
In-situ concrete extinguishing water tank incl. Steel construction.
FIT shaft in in-situ concrete.
Foundations for pipes and fittings.
Technical building equipment in relation to heating, cooling, ventilation, sanitation.
Steel construction for the working platforms, stairs and necessary railings.
All roofing work.
Waste water system incl. Lifting systems.
Drinking water system
Roads (asphalt), paths and squares (paving).