References

NEW CONSTRUCTION OF 4 CITY VILLAS IN HANOVER – MISBURG

References

NEW CONSTRUCTION OF 4 CITY VILLAS IN HANOVER – MISBURG

Client

hanova WOHNEN GmbH

Contact person

Dipl.-Ing. Bertram Vocks

Start of construction

09/2017

Construction time

1.5 years

Scope of services

The buildings were erected as a reinforced concrete structure made of in-situ concrete supplemented by walls made of sand-lime brickwork and precast concrete elements. The façade surfaces were constructed using facing brickwork. The roofs were designed as warm roofs (flat roofs without a ventilated air layer).

In addition to the earthworks and shell construction work, we also carried out the window construction, screed, plastering and roofing work. The aluminum doors in the entrance areas and the facade elements for the balconies and terraces were just as much a part of our job as the railings and fall protection.

The individual basement sections for the apartments were separated by system partition walls.

Work carried out:

Earthworks for the new buildings to be constructed.

Screed and plaster work.

System partition walls.

Metal construction and locksmith work for façade elements and fall protection.

Reinforced concrete and masonry work for the construction of the shell.

Windows and doors suitable for passive houses on pre-wall frames.

Roofing and waterproofing work.

Doors made of aluminum.