NEW CONSTRUCTION OF THE L7350 AND L7494 LINES IN THE NEUENKIRCHEN AND WETTRINGEN AREAS

References

NEW CONSTRUCTION OF THE L7350 AND L7494 LINES IN THE NEUENKIRCHEN AND WETTRINGEN AREAS

Client

Westnetz GmbH / Innogy on behalf of Thyssengas GmbH

Contact person

Dipl.-Ing. Udo Mers

Start of construction

04/2019

Construction time

9 months

Scope of services

The L7350 and L7494 gas pipes were renewed at various points in the towns of Neuenkirchen (Rheine) and Wettringen.

WORK CARRIED OUT:

Civil engineering and pipeline construction work, NDT, relining incl. pressure testing

Partial urban / local relocation in the Neuenkirchen area

Laying of cable conduit along the entire route

Plus various fitting groups

Connections to the gas-carrying system partly with stoppers

Mostly laid using the HDD method in the Wettringen area

New construction of approx. 1.3 km DN 100 / 2.6 km DN 200 / 5.3 km DN 150