NEW CONSTRUCTION OF THE RECKROD 2 COMPRESSOR STATION

References

NEW CONSTRUCTION OF THE RECKROD 2 COMPRESSOR STATION

Client

GASCADE Gas Transport GmbH

Contact person

Dipl.-Ing. Uwe Lammers

Start of construction

04/2023

Construction time

3 years

Scope of services

Together with our joint venture partner Knoll GmbH & Co. KG, we carried out comprehensive building and civil engineering work for the construction of the new compressor station in Reckrod. The services performed included, among other things, the construction of four compressor halls, approximately 22,500 m³ of soil improvement, and the installation of the cable-pulling system with approximately 70,000 m of conduit and 38 cable shafts.

Aerial view of an industrial complex with several buildings, large pipelines, and paved areas, surrounded by fields and a rural landscape with trees, as well as a nearby village.

Work carried out:

Earthwork and site grading, including soil improvement

Carrying out the necessary dewatering

Construction of four compressor buildings with machine foundations and pile foundations, including steel construction

Installation of cable routes as conduit runs, some of which are shielded, including cable pull shafts

Construction of the facades using precast pigmented reinforced concrete panels

Manufacture and installation of steel doors and gates for the compressor buildings

Construction of the foundations for the four EMSR/FU buildings using cast-in-place concrete

Execution of civil engineering work for the video system at the existing facility

Manufacture of foundations for technical equipment, such as piping, valves, blowers, gas coolers, steel structures, lamps, transmitter boxes, etc.

Installation of the fire-fighting water system using PE piping, including a fire-fighting water tank constructed of cast-in-place concrete

Installation of supply and disposal lines for the entire facility

Installation and Commissioning of Crane Systems

Installation of precast aerated concrete slabs for the compressor halls, including waterproofing work

Construction of the foundation and basement of the energy center using cast-in-place concrete

Construction of the station fence system, including doors and gates

Execution of road and path construction work using asphalt and paving stones