NEW POTATO STARCH SILO IN KYRITZ

References

NEW POTATO STARCH SILO IN KYRITZ

Client

Emsland-Stärke GmbH

Contact person

Dipl.-Ing. Bertram Vocks

Start of construction

10/2024

Construction time

10 months

Scope of services

We undertook all the foundation and structural engineering work for the new construction of a silo facility in Kyritz – with the exception of the bored piles on which our foundation components were erected.

The structure covers an area of around 2,050 m² and reaches an impressive total height of 42 meters. A tunnel structure was built underneath the silo to provide access to the conveyor technology at the foot of the Central Column.

A particular highlight of the project was the construction of the floor slab with a volume of approx. 1,700 m³, which was completed in just 16 hours in one continuous concreting section.

The 36.50 meter high walls were then erected using slipforming. These were constructed in just 11 days and nights, using a total of around 2,030 m³ of concrete.

Ein großes zylindrisches Betonsilo steht neben einem hohen rechteckigen Gebäude mit dem Logo der Eraslan-Gruppe. In der Nähe sind Baugeräte und Container unter einem strahlend blauen Himmel zu sehen.

Work carried out:

Foundation work on several levels

Production of a basement tunnel including anchor ring for the central column

Flat foundation with 80 cm thick reinforced concrete base slab

Circumferential steel railing at the top of the wall

Roof drainage with gutter and downpipes

Execution of the silo walls in slipform construction

Delivery and assembly of the roof construction made of glued laminated timber trusses with KVH purlin layer

Delivery and assembly of a crane runway

Roof cladding made of sandwich panels including sealing

Interior cladding of the walls in timber construction