References

NEW ROLLER DRYING PLANT

References

NEW ROLLER DRYING PLANT

Client

Emsland-Stärke GmbH

Contact person

B. Eng. Thomas Krieger

Start of construction

03/2020

Construction time

1.5 years

Scope of services

Construction of all foundation, structural and finishing work for the new roller drying plant with autoclave, known as WaltrAut for short.

The building has a floor area of approx. 750 m² and is over 31 m high. The integrated stair tower made of reinforced concrete reaches a height of almost 34 m.

The building was largely constructed as a reinforced concrete skeleton structure. The individual storeys, each with a height of 4.50 m, have a filigree ceiling with in-situ concrete reinforcement.

Work carried out:

Earthworks

Drainage work in the base slab using stainless steel pipes DN 150 and DN 200, installation of 2 stainless steel channels, individual length 14 m and 5 floor drains DN 200

Masonry work

Coating work

Interior finishing work: Drywall work, tiling work, raised floors, painting work, flooring work

Foundation by means of 151 partial displacement bored piles, diameter 0.62 m and an individual length of approx. 18 m

Construction of the base slab up to 1.06 m thick including all formwork, reinforcement and concrete work

Reinforced concrete skeleton construction

Roof sealing work

Windows, doors, gates, locksmith work

Outdoor facilities