Scope of services
Piping system L 13/4 or L 13/4/50

Replacement of fittings
Separation of the printing systems
19 pieces bindings for slider groups
Installation of emergency connections and additional switching options
Relocation of various pipes and removal of old taps
Fittings and auxiliary lines.
Technical specification:
Pipe diameter: up to DN 400
MOP: 50 bar
Material: Material groups 1 and 2
WORK CARRIED OUT:
Earthworks
Dewatering
Integration of the aforementioned slide groups and tie-in components in a relatively short period of time
Shoring
Prefabrication, testing and re-coating of the slide assemblies and binding components