Client

Open Grid Europe GmbH

Contact Person

Udo Mers, B.S. in Engineering

Start of construction

04/2025

Construction time

8 months

Scope of services

Execution of piping, civil engineering, and dewatering work for the construction of the aforementioned pipelines, including three enclosed crossings. The work was carried out in a joint venture with Mackscheidt.

Work carried out:

Civil engineering work and excavation of pipe trenches for approximately 3.5 km of DN 500 pipe and approximately 800 m of pipe trench for DN 100 pipe

Construction of cable conduit routes over a length of approximately 2.6 km, including the necessary civil engineering work

Pipeline construction for DN 500 and DN 100 in the lengths specified above

Carrying out extensive dewatering work

Conducting pressure tests and coating work on fiberglass-reinforced plastic (FRP) and polyurethane (PUR)

Excavation of the necessary foundation pits for enclosed structures with pit depths of up to 5.0 m

Construction and Maintenance of Construction Roads Using Steel Plates and Excavator Mats

Execution of sheet pile wall construction work

Drilling of 3 press holes for the aforementioned pipes and cable conduits