RENEWAL OF TWO SLIDER GROUPS
Open Grid Europe GmbH
Dipl.-Ing. Udo Mers
04/2023
6 months
Renewal of two slide gate groups on line 63 in Ochtrup
Pipeline construction:
Prefabrication in Neuenhaus. Main pipe DN 1100 / DP 100, branches in DN200 and DN400.
Re-coating by means of PUR coating.
Integration of the slider groups.
Prefabrication with automated welding processes.
Pressure testing and drying.
Civil engineering:
Construction of two excavation pits up to a depth of approx. 4.5m.
Partial shoring by means of soldier pile wall shoring incl. Statics
Dewatering by means of a filter system.