Start of construction

08/2018

Construction time

6 months

Scope of services

New laying of various pipelines using the HDD method in the Grafschaft Bentheim area

Technical specification:

Pipe diameter: DN 150 and DN 250

300m DN 150 (in Hohenkörben line no. 56)

310m DN 250 (in Hohenkörben line no. 64)

MOP: 100 bar

Material: L 360 NB

300m DN 200 (in high baskets line no. 55)

Culvert and plant construction (Wietmarschen)

WORK CARRIED OUT:

Welding, testing, wrapping of pipe strings

Integration of the new pipelines into the existing gas network

Pulling in the pipe strings using the HDD method

Cold cuts by pipe cutter

Pipe bridge dismantled