Replacement of pipes
Mr. Dipl.-Ing. Udo Mers
08/2018
6 months
New laying of various pipelines using the HDD method in the Grafschaft Bentheim area
Pipe diameter: DN 150 and DN 250
300m DN 150 (in Hohenkörben line no. 56)
310m DN 250 (in Hohenkörben line no. 64)
MOP: 100 bar
Material: L 360 NB
300m DN 200 (in high baskets line no. 55)
Culvert and plant construction (Wietmarschen)
Welding, testing, wrapping of pipe strings
Integration of the new pipelines into the existing gas network
Pulling in the pipe strings using the HDD method
Cold cuts by pipe cutter
Pipe bridge dismantled