Anton Meyer Logo
Anton Meyer Schriftzug
  • Services
    • Civil engineering and pipeline construction
    • Pipeline/plant construction
    • Building construction and civil engineering
  • News
  • Career
  • Contact
  • German
A construction worker in a safety vest and helmet works in a trench next to a large, partially exposed underground pipeline surrounded by soil.

Securing the DN 700, DN 1100 and DN 1200 pipes in Kleingründlach

A row of large construction machines places a long pipeline above a deep trench in a sandy area, with power lines and wind turbines visible in the background under a cloudy sky.

Construction of the ZEELINK high-pressure gas pipeline lots 3-5, incl. Construction of 11 barrier and pigging stations

Aerial view of a construction site with large pipes, machinery, workers, trucks, and equipment arranged on a concrete surface, indicating pipeline installation or maintenance work.

RENEWAL OF TWO SLIDER GROUPS

A worker in a high-visibility jacket and hard hat inspects large industrial pipes and equipment inside a bright, modern facility with metal structures and chains hanging from the ceiling.

CONVERSION OF NATURAL GAS STORAGE

Cranes lift and install a long metal pipeline into a trench at a construction site, with construction vehicles and equipment visible in the background under a partly cloudy sky.

NEW CONSTRUCTION OF GAS CONNECTION PIPELINE WILHELMSHAVEN-LEER (LOT 2)

Two large yellow excavators lift and position a long black pipeline along a dirt track outdoors, under a blue sky with scattered clouds. Construction workers are not visible in the image.

Construction of a new high-pressure gas pipeline

Wooden beams secured with blue and green straps are built over a large green pipe in a construction site. Sand and other construction materials are visible around the framework.

Relocation of the Thyssengas pipeline 070-000 in the Duisburg Masurensee area

Aerial view of an industrial facility surrounded by trees, featuring large rectangular buildings, green pipe structures, and construction equipment scattered around the site.

NEW CONSTRUCTION OF A GAS COMPRESSOR STATION

Aerial view of a large construction site next to existing multi-story buildings, with a green crane positioned over the partially built structures, surrounded by trees and nearby residential areas.

EXTENSION OF THE EXISTING BUILDING OF THE EUREGIO CLINIC IN NORDHORN

Aerial view of a large cylindrical concrete structure under construction, surrounded by green fields and roads. A tall crane is positioned over the building site, with scattered construction equipment nearby.

NEW CONSTRUCTION OF SILO 5 IN KARUP/DENMARK

1 2 3 4 5 Next

BUSINESS AREAS

  • Civil engineering and pipeline construction
  • Pipeline/plant construction
  • Building construction and civil engineering

INFORMATION

  • News
  • Downloads
  • Certificates

Letting

  • Suction excavator
  • Padder

CAREER

  • Career
  • Unsolicited applications
  • Pupils and students

CAREER

  • Career
  • Unsolicited applications
  • Pupils and students

ADMINISTRATION
Dackhorstweg 9
D-49828 Neuenhaus

FARM and WORKSHOP
Dackhorstweg 24
D-49828 Neuenhaus

CONTACT
Tel: +49 5941 603 0
Fax: +49 5941 603 160
Mail: info@anton-meyer.de

Red and white logo with bold initials AM on the left and the words ANTON MEYER BAUUNTERNEHMEN in large, light gray capital letters to the right.
Xing
Facebook
Instagram
LinkedIn

© 2025 Anton Meyer GmbH & Co KG | Imprint | Data protection | Give notice | Webdesign by Marketinghuus