Anton Meyer Logo
Anton Meyer Schriftzug
  • Services
    • Civil engineering and pipeline construction
    • Pipeline/plant construction
    • Building construction and civil engineering
  • News
  • Career
  • Contact
  • German
Aerial view of a construction site with large pipes, machinery, workers, trucks, and equipment arranged on a concrete surface, indicating pipeline installation or maintenance work.

RENEWAL OF TWO SLIDER GROUPS

A worker in a high-visibility jacket and hard hat inspects large industrial pipes and equipment inside a bright, modern facility with metal structures and chains hanging from the ceiling.

CONVERSION OF NATURAL GAS STORAGE

Two large yellow excavators lift and position a long black pipeline along a dirt track outdoors, under a blue sky with scattered clouds. Construction workers are not visible in the image.

Construction of a new high-pressure gas pipeline

Wooden beams secured with blue and green straps are built over a large green pipe in a construction site. Sand and other construction materials are visible around the framework.

Relocation of the Thyssengas pipeline 070-000 in the Duisburg Masurensee area

An excavator lowers a pipeline into a trench at a construction site, with workers in safety vests supervising. The surrounding area features dirt, construction materials, and green fields in the background.

LAYING OF A NEW GAS TRANSPORT PIPELINE FROM OBEROHE TO POITZEN

Two large yellow excavators are installing a long section of yellow pipeline in a trench at a construction site under a clear blue sky, with power lines and trees in the background.

NEW CONSTRUCTION OF THE NATURAL GAS TRANSMISSION PIPELINE 56/22 HAMM – BERGKAMEN

Aerial view of a construction site with excavators and vehicles working along a long, narrow trench through green fields on a clear day. Trees and open land surround the area.

NEW CONSTRUCTION OF THE NATURAL GAS TRANSMISSION PIPELINE FROM DATTELN TO RECKLINGHAUSEN, LOT 1

A fenced-off industrial site with white metal pipes, valves, and a brick building. The area is paved with concrete tiles, and there is grass and trees in the background under a clear blue sky.

Conversion of the Twist, Rühlermoor I, Rühlermoor II and Annaveen natural gas stations.

A construction crew uses heavy machinery to lift and position a long section of pipeline into a trench at a worksite surrounded by trees, with safety barriers and equipment visible nearby.

120th relocation of line no. 6 in the Löhne area on the B 61 / Nagelsbach bridge

Several excavators line a residential street, using their arms to support and position a long yellow pipe above a sidewalk. Trees and houses are visible along the road on a cloudy day.

NEW CONSTRUCTION OF THE L7350 AND L7494 LINES IN THE NEUENKIRCHEN AND WETTRINGEN AREAS

1 2 Next

BUSINESS AREAS

  • Civil engineering and pipeline construction
  • Pipeline/plant construction
  • Building construction and civil engineering

INFORMATION

  • News
  • Downloads
  • Certificates

Letting

  • Suction excavator
  • Padder

CAREER

  • Career
  • Unsolicited applications
  • Pupils and students

CAREER

  • Career
  • Unsolicited applications
  • Pupils and students

ADMINISTRATION
Dackhorstweg 9
D-49828 Neuenhaus

FARM and WORKSHOP
Dackhorstweg 24
D-49828 Neuenhaus

CONTACT
Tel: +49 5941 603 0
Fax: +49 5941 603 160
Mail: info@anton-meyer.de

Red and white logo with bold initials AM on the left and the words ANTON MEYER BAUUNTERNEHMEN in large, light gray capital letters to the right.
Xing
Facebook
Instagram
LinkedIn

© 2025 Anton Meyer GmbH & Co KG | Imprint | Data protection | Give notice | Webdesign by Marketinghuus