Anton Meyer Logo
Anton Meyer Schriftzug
  • Services
    • Civil engineering and pipeline construction
    • Pipeline/plant construction
    • Building construction and civil engineering
    • Pipeline services
  • News
  • Career
  • Contact
  • German

Pipeline/plant construction

Aerial view of workers and construction vehicles building a road through green and yellow fields on a sunny day, with scattered trees and houses in the background.

CONSTRUCTION OF A NEW 11.4 KM DN400 HYDROGEN PIPELINE IN HEEK-EPE

A crane lifts a metal bridge across a river, while workers and vehicles are nearby. A small boat floats on the water, and trees and fields surround the scene.

INSTALLATION OF A NEW HIGH-PRESSURE NATURAL GAS PIPELINE USING THE HDD METHOD & DEMOLITION OF TWO PIPE BRIDGES

An orange excavator places equipment along a pipeline trench in a rural area, surrounded by greenery and dirt mounds, with workers and machinery visible along the pipeline.

RELOCATION OF THE SOUTHWEST FALEN PIPELINE—LETMATHER STRASSE (B 236) SECTION, SCHWERTE-ERGSTE

A network of large white industrial pipes and valves is installed outdoors on a paved surface, with buildings, fencing, and machinery visible in the background under a partly cloudy sky.

CONSTRUCTION OF NEW PIPELINES AND STATIONS FOR THE ADORF Z 19 WELL

Several large orange excavators line up along a construction site, next to a long trench. A worker in a safety vest and helmet stands near the edge of the trench, sandy soil piled on one side. Trees and cloudy sky in background.

CONNECTION OF TWO CAVERNS TO THE VDS EPE USING TWO PIPES (DN 300 & DN 100 / DP210)

Aerial view of a construction site with cranes and heavy machinery, surrounded by industrial buildings and forest. Workers, vehicles, and materials are visible on the site.

RECONSTRUCTION AND NEW CONSTRUCTION OF EUGAL, OPAL, AND JAGAL INTERCONNECTORS IN RADELAND

Aerial view of a construction site with large pipes, machinery, workers, trucks, and equipment arranged on a concrete surface, indicating pipeline installation or maintenance work.

RENEWAL OF TWO SLIDER GROUPS

A worker in a high-visibility jacket and hard hat inspects large industrial pipes and equipment inside a bright, modern facility with metal structures and chains hanging from the ceiling.

CONVERSION OF NATURAL GAS STORAGE

Two large yellow excavators lift and position a long black pipeline along a dirt track outdoors, under a blue sky with scattered clouds. Construction workers are not visible in the image.

Construction of a new high-pressure gas pipeline

Wooden beams secured with blue and green straps are built over a large green pipe in a construction site. Sand and other construction materials are visible around the framework.

Relocation of the Thyssengas pipeline 070-000 in the Duisburg Masurensee area

1 2 3 Next

BUSINESS AREAS

  • Civil engineering and pipeline construction
  • Pipeline/plant construction
  • Building construction and civil engineering

INFORMATION

  • News
  • Downloads
  • Certificates

Letting

  • Suction excavator
  • Padder

CAREER

  • Career
  • Unsolicited applications
  • Pupils and students

CAREER

  • Career
  • Unsolicited applications
  • Pupils and students

ADMINISTRATION
Dackhorstweg 9
D-49828 Neuenhaus

FARM and WORKSHOP
Dackhorstweg 24
D-49828 Neuenhaus

CONTACT
Tel: +49 5941 603 0
Fax: +49 5941 603 160
Mail: info@anton-meyer.de

Red and white logo with bold initials AM on the left and the words ANTON MEYER BAUUNTERNEHMEN in large, light gray capital letters to the right.
Xing
Facebook
Instagram
LinkedIn

© 2025 Anton Meyer GmbH & Co KG | Imprint | Data protection | Give notice | Webdesign by Marketinghuus