Anton Meyer Logo
Anton Meyer Schriftzug
  • Services
    • Civil engineering and pipeline construction
    • Pipeline/plant construction
    • Building construction and civil engineering
  • News
  • Career
  • Contact
  • German

RENEWAL OF TWO SLIDER GROUPS

CONVERSION OF NATURAL GAS STORAGE

Construction of a new high-pressure gas pipeline

Relocation of the Thyssengas pipeline 070-000 in the Duisburg Masurensee area

LAYING OF A NEW GAS TRANSPORT PIPELINE FROM OBEROHE TO POITZEN

NEW CONSTRUCTION OF THE NATURAL GAS TRANSMISSION PIPELINE 56/22 HAMM – BERGKAMEN

NEW CONSTRUCTION OF THE NATURAL GAS TRANSMISSION PIPELINE FROM DATTELN TO RECKLINGHAUSEN, LOT 1

Conversion of the Twist, Rühlermoor I, Rühlermoor II and Annaveen natural gas stations.

120th relocation of line no. 6 in the Löhne area on the B 61 / Nagelsbach bridge

NEW CONSTRUCTION OF THE L7350 AND L7494 LINES IN THE NEUENKIRCHEN AND WETTRINGEN AREAS

1 2 Next

BUSINESS AREAS

  • Civil engineering and pipeline construction
  • Pipeline/plant construction
  • Building construction and civil engineering

INFORMATION

  • News
  • Downloads
  • Certificates

Letting

  • Suction excavator
  • Padder

CAREER

  • Career
  • Unsolicited applications
  • Pupils and students

CAREER

  • Career
  • Unsolicited applications
  • Pupils and students

ADMINISTRATION
Dackhorstweg 9
D-49828 Neuenhaus

FARM and WORKSHOP
Dackhorstweg 24
D-49828 Neuenhaus

CONTACT
Tel: +49 5941 603 0
Fax: +49 5941 603 160
Mail: info@anton-meyer.de

Xing
Facebook
Instagram
LinkedIn

© 2025 Anton Meyer GmbH & Co KG | Imprint | Data protection | Give notice | Webdesign by Marketinghuus