Anton Meyer Logo
Anton Meyer Schriftzug
  • Services
    • Civil engineering and pipeline construction
    • Pipeline/plant construction
    • Building construction and civil engineering
  • News
  • Career
  • Contact
  • German
Aerial view of a modern apartment complex with balconies, surrounded by green lawns and trees, in a suburban neighborhood with roads and parked cars visible.

Construction of 2 residential buildings with 24 residential units and 2 commercial units incl. underground parking garage with parking spaces, cellar rooms and technical rooms

A modern, three-story building with balconies, large windows, and a sloped roof, surrounded by greenery and parked cars. People are walking and standing outside near the entrance. The building has colorful signage.

NEW CONSTRUCTION OF 8 RESIDENTIAL UNITS AND A COMMERCIAL UNIT (SPA ADMINISTRATION) WITH UNDERGROUND PARKING IN KELLENHUSEN

An excavator lowers a pipeline into a trench at a construction site, with workers in safety vests supervising. The surrounding area features dirt, construction materials, and green fields in the background.

LAYING OF A NEW GAS TRANSPORT PIPELINE FROM OBEROHE TO POITZEN

Two large, egg-shaped concrete structures under construction, surrounded by scaffolding and a crane. In front, there is a sign with ANTON MEYER BAUUNTERNEHMEN and fencing around the site.

NEW CONSTRUCTION OF DIGESTION TOWER 1+2 WASTEWATER TREATMENT PLANT HANNOVER HERRENHAUSEN

Large metal pipes and industrial equipment are arranged outdoors on gravel, with three large utility buildings in the background under a clear sky.

NEW COMPRESSOR STATION RIMPAR AND GDRM PLANT

A modern, multi-story industrial building with gray paneling and many windows stands beside metal pipes and structures under a partly cloudy sky. The ground in front appears unfinished or under construction.

NEW ROLLER DRYING PLANT

Two large yellow excavators are installing a long section of yellow pipeline in a trench at a construction site under a clear blue sky, with power lines and trees in the background.

NEW CONSTRUCTION OF THE NATURAL GAS TRANSMISSION PIPELINE 56/22 HAMM – BERGKAMEN

Aerial view of a construction site with excavators and vehicles working along a long, narrow trench through green fields on a clear day. Trees and open land surround the area.

NEW CONSTRUCTION OF THE NATURAL GAS TRANSMISSION PIPELINE FROM DATTELN TO RECKLINGHAUSEN, LOT 1

Construction site with large yellow industrial pipes, metal barricades, equipment, and soil piles in the background. The area is enclosed by a wire fence under a cloudy sky.

PARTIAL NEW CONSTRUCTION OF GAS PIPELINE FGL 90 NEUBRANDENBURG-SPONHOLZ TO KLEIN TREBBOW

A fenced-off industrial site with white metal pipes, valves, and a brick building. The area is paved with concrete tiles, and there is grass and trees in the background under a clear blue sky.

Conversion of the Twist, Rühlermoor I, Rühlermoor II and Annaveen natural gas stations.

Previous 1 2 3 4 5 Next

BUSINESS AREAS

  • Civil engineering and pipeline construction
  • Pipeline/plant construction
  • Building construction and civil engineering

INFORMATION

  • News
  • Downloads
  • Certificates

Letting

  • Suction excavator
  • Padder

CAREER

  • Career
  • Unsolicited applications
  • Pupils and students

CAREER

  • Career
  • Unsolicited applications
  • Pupils and students

ADMINISTRATION
Dackhorstweg 9
D-49828 Neuenhaus

FARM and WORKSHOP
Dackhorstweg 24
D-49828 Neuenhaus

CONTACT
Tel: +49 5941 603 0
Fax: +49 5941 603 160
Mail: info@anton-meyer.de

Red and white logo with bold initials AM on the left and the words ANTON MEYER BAUUNTERNEHMEN in large, light gray capital letters to the right.
Xing
Facebook
Instagram
LinkedIn

© 2025 Anton Meyer GmbH & Co KG | Imprint | Data protection | Give notice | Webdesign by Marketinghuus